By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation and analyse site usage.
View our Cookies Policy for more information.

News

+

Case Study

Back to Case Studies
or
Back to News
Wastewater

Blower Installation Project - West Midlands (II)

Blower Installation Project - West Midlands (II)

Blower Installation Project - West Midlands (II)

Service

Wastewater

Client

Press Enquiries

Ian Moore
Ian.moore@airtechnology.co.uk

PDF Download

Click to Download

Project scope was to remove elderly, unreliable blowers with modern, reliable, efficient units whilst upgrading the control system to suit the new machines.

The old installation - note the covers removed from the acoustic enclosures to try and prevent overtemperature trips... This made the blowerhouse noisy and very hot.

Air Technology - Blower Replacement CDM Project

They served their time well, but new turbomachinery has come a long way in 20years with advances in aerodynamics and electronics.

Air Technology - Blower Replacement CDM Project

A month or so later... 4 new VSD Air-Bearing Turbo Compressors installed and running very well

Air Technology - Blower Replacement CDM Project
Air Technology - Blower Replacement CDM Project
Air Technology - Blower Replacement CDM Project
Air Technology - Blower Replacement CDM Project

There's still some tidying up to do, but the site is already reaping the benefits of the efficient and reliable machinery.

Delivered with our colleagues at CEMA (Electrical & Control), Aermech (Mechanical), and JPS Insulation.

Like This?

Wastewater
New Mass Flow Ammonia Control Saves Client Additional 10% Energy Over Standard Ammonia Control
Wastewater
Another great diffuCLEAR result
Air Technology's New Website Goes Live!
Wastewater
Control improvements provide wastewater client with almost £250k of annual savings